Allergopharma GmbH & Co. KG
New aseptic procuction for formulation and filling
One challenging project in our company history was the new aseptic filling line for Allergopharma in Reinbek/Hamburg. The customer is specialized in allergy medication and wanted to expand his existing site with a new production line.
The customer was heading for both a representative and functional production building. However, the existing area was rather limited and local restrictions in the industrial area had to be considered. In a challenging design and execution process we could implement all requirements into a representative and fit-for-purpose building.
The process is based on a wide range of natural products as raw material with a lot of manual steps including long holding times. Another challenge was to transform the traditional process into efficient and focused operation under GMP conditions.
An unplanned confirmation of our good work turned out in 2021, when the plant has started production of BioNTech’s vaccine Comirnaty® in a short time with just some modifications.
Design Highlights
Facts & Figures
Project
New aseptic procuction for formulation and filling
Reinbek, Germany
Customer
Allergopharma GmbH & Co. KG
Duration
2012 – 2016
TIC
Confidential